Box rain test box is a kind of artificial simulation of rain test box, before using it must read the box rain test box instructions, as everyone knows only to understand its structure technical parameters and test principles to better grasp it, afterwards whether the working state or storage state, will be different degrees affected by various water, among which rain is most common, performing rain test is preventing these devices in after rain water penetration and rain when or after the work performance degree change.
1. Kä ye kek looi në kaam de kä ye kek looi në kaam de kä ye kek looi në kaam de kä ye kek looi në kaam de kä ye kek looi në kaam de kä ye kek looi në kaam de kä ye kek looi në kaam de kä ye kek looi
2.Large area visible glass doors, ye kɛ̈ɛ̈k bï kɛ̈ɛ̈k bï kɛ̈ɛ̈k bï kɛ̈ɛ̈k bɛ̈n ya tïŋ;
3. Pivoting pipe swing: në stepping motor, piping control system adopts automation control, piping angle, piping speed can be achieved through instrument setting;
4.Water pump supply water, distribution flow (pressure) regulating valve. Pii ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ A cɔl drainage design can be released quickly at the bottom of the box and will not accumulate water. A cɔl drainage design can be released quickly at the bottom of the box and will not accumulate water.
5. nozzle: tɛ̈n yenë size of the test, volume of the box determines the bending radius of the placement tube; Nozzle ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi, ye nozzle ye looi.
6.Sample table of adjustable rotation speed, table surface is stainless steel, motor rotating, reducer adjust the right rotation speed;
7.Rain test box bottom adopts high quality fixed PU activity wheel, easy user to move. 7.Rain test box bottom adopts high quality fixed PU activity wheel, easy user to move. 7.Rain test box bottom adopts high quality fixed PU activity wheel, easy user to move. 7.Rain test box bottom adopts high quality fixed PU activity wheel, easy user to move.
1. Model: RTE-LY-500
Size of box: ((width * height * depth mm) 800 × 800 × 900
Size of box: ((width * height * depth mm) 1070 × 1350 × 1850
2.Model: HT/LY-1000
Size of box: ((width * height * depth mm) 1000 × 1000 × 1100
Size of box: ((width * height * depth mm) 1090 × 1430 × 1850
1. Pii ye looi: RTE-LY-500: 375mm, HT/LY-1000: 450mm;
2. Pipe diameter: 16mm;
3. Dɛmɛɛr dɔ̈ɔ̈r: 0.4mm;
4. Dɛɛr dɛɛr: 50mm;
5. Piŋ piŋ: 180°±20°;
6. Tɛɛr tɛɛr: 60°/S
7. Tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
8. Pii ye kɔɔr: 98 ~ 106Kpa;
7. Power requirement: AC380 (±10%) V/50HZ three phase five wire system;
1. Control system: programming logic controller (LCD display) to complete the entire system's time, angle, and order control. 1. control system: use programmable logic controller (LCD display) to complete the entire system's time, angle, and order control.
2. ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye t
3. Pivot angle ye PLC drive stepper motor (angle ye looi ku nyuɔɔth);
4. Flow display: high precision organic glass rotor flow meter; 4.
5. Pii ye kɔɔr: tank de pii, pomp de pii ye kɔɔr;
6. Ajuiɛɛr ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k;
7. Time Controller: Import programmable time computer integrated controller; 7.
8. gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël gël
GB4208-2008 ye kɔc cï gël (IPX3, IPX4);
GB4706.1-2005 wɛ̈t ye kɔɔrɔ cɔl safety general requirements for household and similar uses electrical appliances;
GB7000.1-2008 wɛ̈t cï kek ya looi në kë de gël ye kek ya looi në kë de gël ye kek ya looi në kë de gël ye kek ya looi në kë de gël ye kek ya looi
GB/T10485-2007 ye tɛ̈ɛ̈r ye tɛ̈ɛ̈r ye tɛ̈ɛ̈r ye tɛ̈ɛ̈r ye tɛ̈ɛ̈r
1, rain and rain aging test box must first connect to the power supply, then open the power supply switch, the power light is lit to indicate that the controller will automatically enter the setting stop interface. 1, rain and rain aging test box must first connect to the power supply, then open the power supply switch, the power light is lit to indicate that the controller will automatically enter the setting stop interface. Ka tɛmɛ manual de luɔɔi, ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
2, tɛ̈n yenë raan wïc bɛ̈n tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈ A bɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
3, lɔ̈ɔ̈m dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈
4, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ Bɛ̈ɛ̈r dɔ̈ŋ wɛ̈t ye kɔn tɔ̈ɔ̈u yen, ye kɔn tɔ̈ɔ̈u lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈
Ritel Environmental Testing and Testing Equipment Shenzhen City ye raan ye teknoloji ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye.