Pii ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looiProcessing Equipment
Pii ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looiKäke luɔɔi --Lappol Application
Integrated wastewater treatment equipment is mainly used for residential areas, rural towns, highway service areas, hotels, restaurants, hospitals, sanatoriums, schools, shopping malls, ship terminals, stations, airports, industrial mines enterprises, tourist attractions, villas areas, scenic areas and other living wastewater treatment or various industrial organic wastewater treatment similar to living wastewater, its main treatment method is using current more mature biochemical treatment technology.-Biocontact oxidation method, water quality design parameters calculated according to the general living wastewater quality parameters. Biocontact oxidation method, water quality design parameters calculated according to the general living wastewater quality parameters. Biocontact oxidation method, water quality design parameters calculated according to the general living wastewater quality parameters.BOD5Press200mg/lDizayn.
Kä ye kek looi në pi ye kek tɔ̈ɔ̈u në potato chips -Sisitɛm
(1) Septic tank (tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u tɔ̈ɔ̈u)
(2) Piin ye cɔl raw water regulation pool
(3) Biological processing unit;
(4) Pool ye tɔ̈ɔ̈u;
(5) Käke disinfection ku disinfection pool;
(6) Biofiltration;
(7) Lɔ̈ɔ̈m nitrification pool;
(8) Piin cɔl;
(9) Mechanical equipment (including wind turbines, sludge lifting pumps, clean water lifting pumps) (Mechanical equipment) (including wind turbines, sludge lifting pumps, clean water lifting pumps) (Mechanical equipment) (including wind turbines, sludge lifting pumps, clean water lifting pumps);
(10) Sisitɛm anti-flushing
(11(Aye cɔl chlorine dioxide generator, pump dosing system)
(12(System Connection Pipe, Valve)
(13(Sistem Kontrol)

Kä ye kek looi në pi ye kek tɔ̈ɔ̈u në potato chips -Kä puɔth ye kek looi në tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈
1、Integrated wastewater treatment equipment with nitrogen removal phosphorus capability,A lëu bï ya looi në luɔɔi de kä ye kek looi,Lɔ̈ɔ̈m dɛ̈t dɛ̈t dɛ̈t dɛ̈t dɛ̈t dɛ̈t dɛ̈t dɛ̈t,Pii kɔnɔ,Capacity of urban wastewater (Capacity of urban wastewater)
2、Integrated wastewater treatment equipment has a strong ability to resist impact loads. Average stay time of contact oxidation method at6lɛr juëc;
3、Integrated wastewater treatment equipment easy to complete automatic control,Ajuiɛɛr, luɔɔi ka thiin.
4、Integrated wastewater treatment equipment contact oxide pool using an aerator to blow air,Ka fiber beam bɛ̈n looi,Aerial uniform,Microbe dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ dɔŋ,A ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
5、Integrated wastewater treatment equipment contact oxide pool fillers are mostly combination soft fillers,Kɔnɔŋ, kɔnɔŋ, kɔnɔŋ, kɔnɔŋ, kɔnɔŋ, kɔnɔŋ, kɔnɔŋ, kɔnɔŋ, kɔnɔŋ,A dɔŋ kä surface,Biofilm adherence strong,Pii ye kɔnɔ ku biofilm ye kɔnɔ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ;
6、Integrated wastewater treatment equipment submersible pump can be placed in equipment,Investment engineering dɔ̈ɔ̈r;
7、Integrated wastewater treatment equipment water output quality stable,Luɔi ye tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u;
Pii ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looiKäke luɔɔi --Parameters Teknikal
1Elektrik Source: Three Phase Four Line5kVA

2Kä ye kek luɔ̈ɔ̈i:0.75kwPump dɔ̈ŋ4Taŋ,0.75kwVentilator3Taiyi
3Pii ye looi:55Ton/Dɛn
4、Integrated wastewater treatment equipment size:8.0*2.0*2.5(Long*Width*Yüksekm)
Pii ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looiKäke luɔɔi --Otomatik Kontrol
Kä ye kek tɔ̈ɔ̈u piny, ye kek tɔ̈ɔ̈u pinyPLCAjuiɛɛr ë automatik. Pump de pii ye lɔ̈ɔ̈m aye rot looi në ye mɛn, ka piyi ye tɔ̈ɔ̈u në ye mɛn ye tɔ̈ɔ̈u në ye mɛn ye tɔ̈ɔ̈u në ye mɛn ye tɔ̈ɔ̈u në ye mɛn ye tɔ̈ɔ̈u në ye mɛn ye tɔ̈ɔ̈u në ye mɛn
Na ye koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koom ye tɔ̈u në koo
Fans fila ye luɔ̈ɔ̈i në ye mɛn, ye raan tök ye cɔk, ye raan dɛ̈t ye luɔ̈ɔ̈i në ye mɛn, ye raan tök ye luɔ̈ɔ̈i në ye mɛn, ye raan tök ye luɔ̈ɔ̈i në ye mɛn, ye raan tök ye luɔ̈ɔ̈
Kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ
Pii ye kek looi kä ye kek looi kä ye kek looi kä ye kek looi kä ye kek looiKäke luɔɔi --Installation, debugging, maintenance of equipment:
Install:

1Users provide installation method: ground or ground, at the same time as our company's equipment plane layout map and equipment foundation map to provide equipment foundation (concrete foundation), requiring the foundation average bearing pressure as5000Kg/m2Yɔ̈ɔ̈k.
Tɔŋ adhil bɛ̈n tɔ̈ɔ̈u, tɛ̈n ye tɔ̈ɔ̈u, tɛ̈n ye tɔ̈ɔ̈u, tɛ̈n ye tɔ̈ɔ̈u500 mmA tɔ̈u nhial, a kɛnɛya tɛ̈n yenë a tɛ̈n yenë a tɔ̈u yen.
Tɛ̈n ye raan tɔ̈ɔ̈u në crane yic, a wïc ba tɛ̈n ye raan tɔ̈ɔ̈u thïn tɔ̈ɔ̈u thïn tɔ̈ɔ̈u thïn tɔ̈ɔ̈u thïn tɔ̈ɔ
Ka tɛmɛ pipi ye tɛmɛ, ka tɛmɛ pipi ye tɛmɛ, ka tɛmɛ pipi ye tɛmɛ, ka tɛmɛ pipi ye tɛmɛ, ka tɛmɛ pipi ye tɛmɛ, ka tɛmɛ pipi ye tɛmɛ. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
Tïŋ kä juëc ye kek looi. Lɔ̈k tɛ̈n yenë yen tɔ̈ɔ̈u tɛ̈n yenë yen tɔ̈ɔ̈u tɛ̈n yenë yen tɔ̈ɔ̈u tɛ̈n yenë yen tɔ̈ɔ̈
Debug:
Pump ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ
N'a ye pi ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ.
Temperature ye average ye20When ℃, life wastewater biofilm cultivation time is generally required. ℃ When ℃, life wastewater biofilm cultivation time is generally required. ℃ When ℃, life wastewater biofilm cultivation time is generally required. ℃ When1-2Week, industrial organic wastewater biofilm cultivation and domestication time generally required3-4Yök.
Kuen:
Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye.
A cï bɛ̈n ya tɔ̈ɔ̈u lɛ̈ɛ̈r tök tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen
Na cï yen luui apath, a dhil bɛ̈n ya tɔ̈ɔ̈u bɛ̈n ya tɔ̈ɔ̈u bɛ̈n ya tɔ̈ɔ̈u20m3/hNë ye thaa kënë, tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen
Tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ
Ka tɔ̈u yen, ka tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen
Në kë de kä ye kek looi bï kek ya luɔ̈ɔ̈i apath ku jɔl ya kä ye kek looi bï kek ya luɔ̈ɔ̈i apath, ka tɛ̈n yenë kek ya luɔ̈ɔ̈i apath, ka tɛ̈n yenë kek ya luui apath, ka tɛ̈n yenë kek ya luui apath10000-12000Lɔ̈k ye kɔc tɔ̈ɔ̈u në thaa tök. Pump ye kɔc tɔ̈ɔ̈u në thaa tök8000-10000Lɔ̈ɔ̈i dɛ̈t tök në thaa.
Ajuiɛɛr ye kɔnɔ ka looi aye10Saan.
