I. Bayan
DDSY6607 electronic single phase pre-paid power meter, ye luui në advanced dedicated integrated circuit design, fully automatic surface mounting (SMT) production process. Lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈ Ka tɛmɛ smart IC card technology ye kɔc cɔl advance card technology ye kɔc cɔl advance card technology ye kɔc cɔl advance card technology ye kɔc cɔl advance card technology ye kɔc cɔl advance card technology ye kɔc cɔl advance card technology ye kɔc cɔl advance card technology. Ka kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈
Kä ye kek looi aye gam GB/T17215.321-2008Level ku2nd level stationary AC active electricity meter" ku GB/T 18460.3-2001 "IC card prepaid electricity selling system part 3: prepaid electricity meter" ka wɛrɛw bɛɛ
II. Luɔi luɔi
1. Ajuiɛɛr
Elektrik ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ
2. Luɔi data
Power Meter Pulse Through Optoelectric CouplerCPU processing, a tɔ̈ɔ̈u në memory yic. Kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta ye kɔmpiöta
3, Specifications Model and Technical Parameters: Model Specifications and Technical Parameters: Model Specifications and Technical Parameters: Model Specifications and Technical Parameters: Model Specifications and Technical Parameters: Model Specifications and Technical Parameters:
1, Specifications Model
|
Specifications Model |
Level of accuracy |
Voltage Specifications (V) |
Current Specifications (A) |
|
DDSY6607 |
1.0 |
220 |
5(20)、10(40)ë 20 (80) |
2.Main technical parameters:
a、 Kɔl ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan:
|
Load Current (Load Current) |
Power Factor ye |
Limit of error (%) |
|
0.05Ib≤I<0.1Ib |
1.0 |
±1.0 |
|
0.1Ib≤I≤Imax |
±0.6 |
|
|
0.1Ib≤I<0.2Ib |
0.5 (tɛ̈ɛ̈r) 0.8 (tɛ̈ɛ̈r) |
±1.0 |
|
0.2Ib≤I≤Imax |
±0.6 |
b、 Gas parameters (ye kɛ̈ɛ̈r)
Kɔnɔ: 0.4% Ib
Power consumption: Voltage line <1.0W,3.0VA;
Kɔmpiye < 1.0VA
Potential: ye logic anti-potential circuit
Voltage range:220V±10%
Tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
Lɔ̈ɔ̈i de data tɔ̈ɔ̈u > 20 years
4. Installation and Use (Lɔ̈ɔ̈i kɛnɛ luɔɔi)
1, ye tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen
2, electric meter should be installed in a dry ventilation place, installed electric meter's bottom plate should be fixed on a solid fire resistant wall, not easy to vibrate, the electric meter height is about 1.8m. 2, electric meter should be installed in a dry ventilation place, installed electric meter's bottom plate should be fixed on a solid fire resistant wall, not easy to vibrate, the electric meter height is about 1.8m.
3, ye foto 1, foto 2 install and wiring, tighten the wiring screw, and tighten the end button box inside the connecting plate. 3, ye foto 1, foto 2 install and wiring, tighten the wiring screw, and tighten the end button box inside the connecting plate.
4, tɛ̈n yenë kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ
5, kaar 1: kaar IC ye kɔc tɔ̈ɔ̈u ka lëu bɛ̈n waar, ka bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n bɛ̈n.
6, looi bɛ̈ɛ̈i ɣɔɔc: ka tɛ̈n yen bɛ̈ɛ̈i ɣɔɔc, raan dɔ̈t adhil bɛ̈ɛ̈i IC card tääu në kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar
7, wɛ̈t ye ɣɔɔc: të cenë wɛ̈t ye ɣɔɔc, ka IC card tääu në IC card reader, ku ka computer ya luui, ka bɛ̈n ya luui
Kod de baai, wɛ̈t ye kɔɔr, wɛ̈t ye kɔɔr, wɛ̈t ye kɔɔr, wɛ̈t ye kɔɔr, wɛ̈t ye kɔɔr, wɛ̈t ye kɔɔrIC kaar.
8Lɔ̈ɔ̈i de kaar de wëu: Lɔ̈ɔ̈i kaar de wëu në kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaar de kaarLCDTabel ye nyuɔɔth:Kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ, kuen dɔ̈ŋ.
9, luɔɔi ye nyuɔɔth: tɛ̈n yenë wɛ̈ɛ̈r ye tɔ̈u thïn, wɛ̈ɛ̈r ye tɔ̈u thïn, wɛ̈ɛ̈r ye tɔ̈u thïn, wɛ̈ɛ̈r ye tɔ̈u thïn, wɛ̈ɛ
10, alarm: tɛ̈n yenë kɛ̈ɛ̈r ye tɔ̈u thïn, na "alarm indicator light" ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë N'a tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛKa tɛmɛ seconds, gates will be pulledminit 3; Na cï raan cï luɔ̈ɔ̈i bɛ̈n lɔ̈ɔ̈m, a bï rot bɛ̈n lɔ̈ɔ̈m.
11, Limit of stocking: If the purchase of electricity + remaining electricity > Limit of stocking (10000kWh) (Limit of stocking: If the purchase of electricity + remaining electricity > Limit of stocking (10000kWh) (Limit of stocking: If the purchase of electricity + remaining electricity > LimitO ye, ka bɛ̈ɛ̈i ye ɣaac, ka bɛ̈ɛ̈i ye nyuɔɔth"Error=10" ye wona lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ lɔnadɛ
12, tɛ̈n yenë kɔc lɛ̈k tɛ̈n yenë kɔc lɛ̈k tɛ̈n yenë kɔc lɛ̈k tɛ̈n yenë kɔc lɛ̈k tɛ̈n yenë kɔc lɛ̈k tɛ̈n yenë kɔc lɛ̈k tɛ̈n
13Lɛ̈k ë wɛ̈t ë wɛ̈t ë wɛ̈t ë wɛ̈t ë wɛ̈t ë wɛ̈t ë wɛ̈t ë wɛ̈t"Pull gate alarm power" when, "alarm indicator light" always bright, the liquid crystal displays the "pull gate" prompt, relay pull gate, when this user can insert the purchase power card into the electric meter once, the electric meter will be closed, "alarm indicator light" continues to bright, when this user should go quickly to the power supply department to buy electricity, so as not to be able to buy electricity at the time and not be able to use electricity. Na yïn tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n t
14, wɛ̈t ye kɔc ɣɔɔc: të cenë wɛ̈t ye kɔc ɣɔɔc tɔ̈u thïn tɔ̈u thïn tɔ̈u thïn tɔ̈u thïn tɔ̈u thïn tɔ̈u thïn tɔ̈u thïn tɔ̈
15Lɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k"Pull gate" alert, to electricity meter continues to operate, users should buy electricity immediately, and actively reflect the situation to the power supply department. "Pull gate" alert, to electricity meter continues to operate, users should buy electricity immediately, and actively reflect the situation to the power supply department.
