Nanjing Vic Environmental Protection Technology Co., Ltd. (Nanjing Vic Environmental Protection Technology Co., Ltd.)
Kuæa>Proizvodi>Rotary Grid Remover
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
  • Адрес
    China Jiangsu Nanjing City Hehe District Chengqiao Street 192 Changchun East Road
Kontakt sada
Rotary Grid Remover
A. Rotary Grid Removal Machine Introduction Rotary Grid Removal Machine ye masin ye k?c c?l water treatment equipment ye k?c c?l water treatment equip
Detalji proizvoda

A. Rotary Grid Removal Machine Introduction
Rotary Grid Remover ye masin ye koom ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment ye kɔc cɔl water treatment equipment Tɛ̈n yenë motor reducer ye rot looi, rake tooth chain ye rot looi në tɛ̈n yenë pi ye rot looi.
II. Rotary Grid Remover Specifications Parameters

Third, Rotary Grid Removal Machine nafa
1, No permanent soaking parts, corrosion resistance strong, service life long. 1, no permanent soaking parts, corrosion resistance strong, service life long. 1, no permanent soaking parts, corrosion resistance strong, service life long.
2. Masin dɔ bɛ̈ɛ̈n looi koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor
3, ye tɛ̈n yenë riɛl ye tɔ̈ɔ̈u thïn, ye tɛ̈n yenë riɛl ye tɔ̈ɔ̈u thïn, a lëu bï rot ya looi.
4, ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan
5, ye looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi de looi.
6, tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n
7, luɔɔi dɔ̈ɔ̈ŋ, ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ
4. Rotary Grid Removal Machine
1. Pii tɔ̈u piny tɔ̈u piny tɔ̈u piny tɔ̈u piny tɔ̈u piny tɔ̈u piny tɔ̈u piny tɔ̈u piny.
2. Pii ye looi në ɣän ke kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony de kony.
3, kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc.
4, ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈
5, tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r
6, textile printing and dyeing wastewater, chemical wastewater, slaughter wastewater, fur-making leather wastewater, paper-making wastewater treatment before screening to prevent blocking of water pump.
7, ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye k
8, a lëu bï ya looi ka kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔ
5. Rotary Grid Removal Machine Equipment Operation
1, a ye raan ye tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈
2, tɛ̈n yenë yen kony tɔ̈ɔ̈u thïn, ka kony tɔ̈ɔ̈u thïn, ka tɛ̈n yenë yen kony tɔ̈ɔ̈u thïn, ka tɛ̈n yenë yen kony tɔ̈ɔ̈u thïn.
3, start operation, first check the electrical control phase of the line, instrument, button should be in a normal state, then place the power switch at the "start" location, the tooth rake can be operated by manual or automatic control. 3, start operation, first check the electrical control phase of the line, instrument, button should be in a normal state, then place the power switch at the "start" location, the tooth rake can be operated by manual or automatic control.
4, after connecting the power supply for empty load test operation, first should click, manual switch, watch the grid should not shake, card blocking and abnormal noise, if there is abnormal phenomena should stop checking, excluding. 4, after connecting the power supply for empty load test operation, first should click, manual switch, watch the grid should not shake, card blocking and abnormal noise, if there is abnormal phenomena should stop checking, excluding.
5, të cenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ
6, ye waat tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen t
Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!