Yongjia County Sea Pump Factory
Kuæa>Proizvodi>TSWA horizontal clean water low speed centrifugal multi-stage pump
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    13676799385
  • Адрес
    No.8, Linpu Road, Zhangburg Industrial Zone, Jinbei Town, Yongjia County, Zhejiang
Kontakt sada
TSWA horizontal clean water low speed centrifugal multi-stage pump
TSWA horizontal clean water low-speed centrifugal multi-stage pump ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈ A ye luɔ̈ɔ̈i n
Detalji proizvoda

Model maana
TSWA卧式低转速多级清水泵型号意义

Produk Profile
TSWA horizontal clean water low-speed centrifugal multi-stage pump ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈
A ye luɔ̈ɔ̈i në koom ye kɔc cɔl high pressure, koom ye kɔc cɔl high-rise buildings, a lëu bï ya luɔ̈ɔ̈i në koom ye kɔc cɔl factory mines.
Pump flow 10 ~ 155 m3 / h, lift range 15 ~ 300m, support power range 2.2 ~ 200kw, caliber range 50 ~ 150mm.
TSWA tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n

Karakteristika Produk
1, TSWA horizontal water clean low speed centrifugal multi-stage pump structure compact, small size, beautiful appearance, covering a small area, saving construction costs.
2, TSWA horizontal water clean low speed centrifugal multi-stage pump rotor parts are supported by two ends of rolling bearings, and the pump operates smoothly. 2, TSWA horizontal water clean low speed centrifugal multi-stage pump rotor parts are supported by two ends of rolling bearings, and the pump operates smoothly.
3, TSWA horizontal clean water low speed centrifugal multi-stage pump import is horizontal direction, exit is vertical up layout, simplifying the pipeline; 3, TSWA horizontal clean water low speed centrifugal multi-stage pump import is horizontal direction, exit is vertical up layout, simplifying the pipeline; 3, TSWA
4, TSWA horizontal water clean low speed centrifugal multi-stage pump motor is horizontal structure, easy to repair.

Kuen karen
A ye luɔ̈ɔ̈i në ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic, ɣän juëc yiic.

Terms of Use
1, a lëu bɛ̈n ya tɔ̈ɔ̈u në pii cïmën yic ku kä ye kek looi në pii cïmën yic, kä ye kek looi në pii cïmën yic, kä ye kek looi në pii cïmën yic, kä ye kek looi në pii cïmën yic
2, tɛmɛ: -15 ℃ ~ 80 ℃;
3, tɛ̈n yenë yen luui: tɛ̈n yenë yen luui <3.0MPa; (I.e.: System pressure = inlet pressure + pump working pressure ≤3.0MPa)
4, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
5. Lɔnadɛ̈ ke pump ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔ
N'a tɛ̈n ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc

Struktur bayanna
1, TSWA horizontal water clean low speed centrifugal multi-stage pump is a multi-stage segment type structure, its inhalation port is horizontal direction, its ejection port is vertical up layout, having 50, 75, 100, 125, 150 and other calibers, users according to the flow, lifting needs choose different sizes and grades of pumps to get satisfied.
2, TSWA horizontal water clean low speed centrifugal multi-stage pump mainly consists of inlet water section, middle section, guide leaf, wheel, output water section and bearing body parts, sealing parts etc., its structure design is reasonable.
3, TSWA horizontal water clean low speed centrifugal multi-stage pump rotor parts are composed of medium carbon steel shaft, cast iron wheel, balance disk and shaft sleeve etc., the rotor ends two support on dry oil lubricated rolling bearing, because of the wheel's excellent kinetic balance and balance disk's hydraulic balance role, making the pump work very smooth, and noise low, vibration small.
4, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ, ye kɔnɔ
5, hanga ka cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ̈ɛ̈k ye cɛ
6, TSWA horizontal clean water low speed centrifugal multi-stage pump and electric motor are installed simultaneously on a public cast iron base, its torque is passed through an elastic coupling. 6, TSWA horizontal clean water low speed centrifugal multi-stage pump and electric motor are installed simultaneously on a public cast iron base, its torque is passed through an elastic coupling.

Struktur diagram

TSWA卧式清水低转速离心多级泵结构示意图
Serial No
Nyuɔ
Materiɛl
Serial No
Nyuɔ
Materiɛl
Serial No
Nyuɔ
Materiɛl
Serial No
Nyuɔ
Materiɛl
1
Links
HT200
7
Guide
HT200
13
Balance disk
HT200
19
Left bearing cover
HT200
2
Left bearing cover
HT200
8
Middle
HT200
14
Filler
HT200
20
Left bearing cover
Q235
3
Left bearing seat
HT200
9
Last Leaf
HT200
15
Left bearing seat (Left bearing seat)
HT200
21
Bearing
Bronze tin
4
Left filling cover
HT200
10
Pii tɔ̈u
HT200
16
Filling Cover
HT200
22
Left bearing housings
Q235
5
Pii dɔ
HT200
11
Balance segment
HT200
17
Right filling shaft cover
Q235
23
Left filling shaft cover
Q235
6
Wheel
HT200
12
Balance Ring
HT200
18
Bearing donyi
Q235
24
Axis
45 wala 2Cr13

Spektrogram

TSWA卧式清水低转速离心多级泵型谱图
TSWA卧式清水低转速离心多级泵型谱图
TSWA卧式清水低转速离心多级泵型谱图
TSWA卧式清水低转速离心多级泵型谱图

Parametre luɔɔi

Model
Level
Traffic
Yangzheng
Speed
Puɔth (kw)
Efisiensi
Yïn lëu ba vacuum nhial
Gas corrosion margin
Weight ye
m3/h
L/S
m
r/min
Axis Power
Motor Power
%
m
m
kg
50TSWA18-9.2*2
2
18
5
18.4
1450
1.37
2.2
66
7.2
3.1
135
50TSWA18-9.2*3
3
18
5
27.6
1450
2.05
3
66
7.2
3.1
155
50TSWA18-9.2*4
4
18
5
36.8
1450
2.73
4
66
7.2
3.1
175
50TSWA18-9.2*5
5
18
5
46
1450
3.42
5.5
66
7.2
3.1
195
50TSWA18-9.2*6
6
18
5
55.2
1450
4.1
5.5
66
7.2
3.1
215
50TSWA18-9.2*7
7
18
5
64.4
1450
4.79
7.5
66
7.2
3.1
235
50TSWA18-9.2*8
8
18
5
73.6
1450
5.47
7.5
66
7.2
3.1
155
50TSWA18-9.2*9
9
18
5
82.8
1450
6.15
7.5
66
7.2
3.1
275
50TSWA18-9.2*10
10
18
5
92
1450
6.84
11
66
7.2
3.1
295
50TSWA18-9.2*11
11
18
5
101.2
1450
7.52
11
66
7.2
3.1
315
50TSWA18-9.2*12
12
18
5
110.4
1450
8.2
11
66
7.2
3.1
335
Model
Level
Traffic
Yangzheng
Speed
Puɔth (kw)
Efisiensi
Yïn lëu ba vacuum nhial
Gas corrosion margin
Weight ye
m3/h
L/S
m
r/min
Axis Power
Motor Power
%
m
m
kg
75TSWA36-11.5*2
2
36
10
23
1450
3.22
5.5
70
7.2
3
75TSWA36-11.5*3
3
36
10
34.5
1450
4.83
7.5
70
7.2
3
75TSWA36-11.5*4
4
36
10
46
1450
6.45
11
70
7.2
3
75TSWA36-11.5*5
5
36
10
57.5
1450
8.06
11
70
7.2
3
75TSWA36-11.5*6
6
36
10
69
1450
9.67
15
70
7.2
3
75TSWA36-11.5*7
7
36
10
80.5
1450
11.28
15
70
7.2
3
75TSWA36-11.5*8
8
36
10
92.5
1450
12.89
18.5
70
7.2
3
75TSWA36-11.5*9
9
36
10
103.5
1450
14.5
18.5
70
7.2
3
75TSWA36-11.5*10
10
36
10
115
1450
16.12
22
70
7.2
3
75TSWA36-11.5*11
11
36
10
126.5
1450
17.73
22
70
7.2
3
Model
Level
Traffic
Yangzheng
Speed
Puɔth (kw)
Efisiensi
Yïn lëu ba vacuum nhial
Gas corrosion margin
Weight ye
m3/h
L/S
m
r/min
Axis Power
Motor Power
%
m
m
kg
100TSWA69-15.6*2
2
69
19.2
31.2
1450
8.03
11
73
7
3.3
100TSWA69-15.6*3
3
69
19.2
46.8
1450
12.05
15
73
7
3.3
100TSWA69-15.6*4
4
69
19.2
62.4
1450
16.07
22
73
7
3.3
100TSWA69-15.6*5
5
69
19.2
78
1450
20.09
30
73
7
3.3
100TSWA69-15.6*6
6
69
19.2
93.6
1450
24.11
30
73
7
3.3
100TSWA69-15.6*7
7
69
19.2
109.1
1450
28.13
37
73
7
3.3
100TSWA69-15.6*8
8
69
19.2
124.8
1450
32.14
45
73
7
3.3
100TSWA69-15.6*9
9
69
19.2
140.4
1450
36.16
45
73
7
3.3
100TSWA69-15.6*10
10
69
19.2
156
1450
40.18
55
73
7
3.3
Model
Level
Traffic
Yangzheng
Speed
Puɔth (kw)
Efisiensi
Yïn lëu ba vacuum nhial
Gas corrosion margin
Weight ye
m3/h
L/S
m
r/min
Axis Power
Motor Power
%
m
m
kg
125TSWA90-21.6*2
2
90
25
43.2
1450
14.32
22
74
6.8
3.4
125TSWA90-21.6*3
3
90
25
64.8
1450
21.48
30
74
6.8
3.4
125TSWA90-21.6*4
4
90
25
86.4
1450
28.63
45
74
6.8
3.4
125TSWA90-21.6*5
5
90
25
108
1450
35.79
55
74
6.8
3.4
125TSWA90-21.6*6
6
90
25
129.6
1450
42.95
75
74
6.8
3.4
125TSWA90-21.6*7
7
90
25
151.2
1450
50.11
75
74
6.8
3.4
125TSWA90-21.6*8
8
90
25
172.8
1450
57.27
90
74
6.8
3.4
125TSWA90-21.6*9
9
90
25
194.4
1450
64.43
90
74
6.8
3.4
125TSWA90-21.6*10
10
90
25
216
1450
71.59
90
74
6.8
3.4
Model
Level
Traffic
Yangzheng
Speed
Puɔth (kw)
Efisiensi
Yïn lëu ba vacuum nhial
Gas corrosion margin
Weight ye
m3/h
L/S
m
r/min
Axis Power
Motor Power
%
m
m
kg
150TSWA155-30*2
2
155
43
60
1450
32.91
45
77
7.7
2.5
150TSWA155-30*3
3
155
43
90
1450
49.37
75
77
7.7
2.5
150TSWA155-30*4
4
155
43
120
1450
65.82
90
77
7.7
2.5
150TSWA155-30*5
5
155
43
150
1450
82.28
110
77
7.7
2.5
150TSWA155-30*6
6
155
43
180
1450
98.74
132
77
7.7
2.5
150TSWA155-30*7
7
155
43
210
1450
115.19
132
77
7.7
2.5
150TSWA155-30*8
8
155
43
240
1450
131.19
160
77
7.7
2.5
150TSWA155-30*9
9
155
43
270
1450
148.1
200
77
7.7
2.5

Installation size

TSWA卧式清水低转速离心多级泵安装尺寸图
TSWA卧式清水低转速离心多级泵安装尺寸图
TSWA卧式清水低转速离心多级泵安装尺寸图
TSWA卧式清水低转速离心多级泵安装尺寸图
Model
Level
Pump size (H2=B)
Size feet
Import and Export Flanders (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans)
L
L1
L2
B
H3
L3
L4
L5
B1
B2
4-φb
D
D1
Dn
n-φd
50TSWA18-9.2*2
2
1087
160
145
230
480
901
600
33
335
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*3
3
1152
225
210
230
480
901
600
33
335
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*4
4
1237
290
275
230
480
974
640
128
375
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*5
5
1377
355
340
230
490
1153
740
132
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*6
6
1442
420
405
230
490
1153
740
197
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*7
7
1547
485
470
230
490
1321
840
197
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*8
8
1612
550
535
230
490
1321
840
262
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*9
9
1677
615
600
230
490
1386
860
297
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*10
10
1827
680
665
230
490
1593
900
362
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*11
11
1930
745
730
230
490
1593
1000
427
430
430
4-φ25
160
125
50
4-φ18
50TSWA18-9.2*12
12
1957
810
795
230
490
1658
1200
462
430
430
4-φ25
160
125
50
4-φ18
Model
Level
Pump size (H2=B)
Size feet
Import & Export Flanders
L
L1
L2
B
H3
L3
L4
L5
B1
B2
4-φb
D
D1
Dn
n-φd
75TSWA36-11.5*2
2
1241
177
180
250
535
1046
690
89
410
475
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*3
3
1361
257
260
250
545
1046
690
128
410
475
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*4
4
1526
337
340
250
545
1284
830
171
475
475
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*5
5
1606
417
420
250
545
1284
830
211
475
475
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*6
6
1731
497
500
250
545
1488
980
245
475
475
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*7
7
1811
577
580
250
545
1488
980
245
475
475
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*8
8
1916
657
660
250
560
1653
1150
239
480
480
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*9
9
1996
737
740
250
560
1653
1150
239
480
480
4-φ25
195
160
80
4-φ18
75TSWA36-11.5*10
10
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
75TSWA36-11.5*11
11
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Model
Level
Pump size (H2=B)
Size feet
Import and Export Flanders (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans) (Frans)
L
L1
L2
B
H3
L3
L4
L5
B1
B2
4-φb
D
D1
Dn
n-φd
100TSWA69-15.6*2
2
1575
255
200
310
610
1322
900
100
505
505
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*3
3
1720
355
300
310
610
1322
900
149
505
505
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*4
4
1885
455
400
310
610
1463
975
200
505
505
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*5
5
2050
555
500
310
620
1701
1240
202
525
525
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*6
6
2150
655
600
310
620
1701
1240
157
525
525
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*7
7
2295
755
700
310
630
1959
1450
198
565
565
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*8
8
2420
855
800
310
640
1959
1450
199
565
565
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*9
9
2520
955
900
310
640
2059
1550
199
565
565
4-φ30
230
190
100
8-φ23
100TSWA69-15.6*10
10
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Model
Level
Pump size (H2=B)
Size feet
Import & Export Flanders
L
L1
L2
B
H3
L3
L4
L5
B1
B2
4-φb
D
D1
Dn
n-φd
125TSWA90-21.6*2
2
1740
270
205
320
670
1312
990
220
500
500
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*3
3
1890
370
305
320
670
1449
1000
230
500
500
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*4
4
2060
470
405
320
680
1603
1100
240
520
520
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*5
5
2250
570
505
320
695
1774
1170
270
570
520
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*6
6
2420
670
605
320
725
2005
1260
305
630
520
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*7
7
2520
770
705
320
725
2005
1260
305
630
520
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*8
8
2670
870
805
320
725
2243
1430
305
630
570
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*9
9
2770
970
905
320
725
2243
1430
305
630
520
4-φ30
270
220
125
8-φ25
125TSWA90-21.6*10
10
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Model
Level
Pump size (H2=B)
Size feet
Import & Export Flanders
L
L1
L2
B
H3
L3
L4
L5
B1
B2
4-φb
D
D1
Dn
n-φd
150TSWA155-30*2
2
1964
236
237
350
720
1437
1000
80
720
575
4-φ30
280
240
150
8-φ23
150TSWA155-30*3
3
2234
350
352
350
735
1735
1165
148
735
675
4-φ30
280
240
150
8-φ23
150TSWA155-30*4
4
2399
465
467
350
745
1922
1260
215
745
675
4-φ30
280
240
150
8-φ23
150TSWA155-30*5
5
2664
580
582
350
780
2129
1470
212
780
765
4-φ30
280
240
150
8-φ23
150TSWA155-30*6
6
2829
695
697
350
/
/
/
/
/
/
/
/
/
/
/
150TSWA155-30*7
7
2944
810
812
350
/
/
/
/
/
/
/
/
/
/
/
150TSWA155-30*8
8
3019
925
927
350
/
/
/
/
/
/
/
/
/
/
/
150TSWA155-30*9
9
3224
1040
1042
350
/
/
/
/
/
/
/
/
/
/
/

Installation Instructions
(1) Luɔi ye looi ka tɛmɛ:
1. Luɔ̈ɔ̈i bɛ̈ɛ̈i ku bɛ̈ɛ̈i ku bɛ̈ɛ̈i ku bɛ̈ɛ̈i ku bɛ̈ɛ̈i;
2. tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen tɛmɛ yen
3. Gɛlɛ tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n.
(2) Lɛ̈k tɔ̈ɔ̈u:
1.When unit to be transported to the site, the accompanying base has corrected the water pump and the motor, finding a flat base can't have to remove the water pump and the motor, so installing is very convenient.
2. Lɔ̈ɔ̈m piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny de piny
3. ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ
4.When unit power is large, to facilitate transportation can be separated pump, motor and base packaging, when this time users need to install themselves, correct water pump unit, its method is as follows:
a、 Lɔ̈ɔ̈m bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈
b、 Lɔ̈k pump shaft level, tɔ̈ɔ̈u piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny piny
c、 Lift motor, so that the pump coupling and motor coupling work together, put down the motor to the base on the corresponding position. Lift motor, so that the pump coupling and motor coupling work together, put down the motor to the base on the corresponding position.
d、 Adjust the two coupling gap is about 5mm, and correct the motor shaft and pump shaft's axis line overlap, its method is to place a flat scale on the coupling, the two coupling outer circle should be equal to a flat scale, if not overlap, should adjust the relative position of the motor or pump, or pad with thin iron sheets to adjust.
e、 Walasa ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka t
5. to unit wala basis, a wajib a install directly on the foundation, a method is similar to 4. but should be more attentive to correction. to unit has no base, a wajib a install directly on the foundation, a method is similar to 4. but should be more attentive to correction.
(3) Lëk ye looi:
1.When installing the pipeline should not bear on the pump, otherwise it is easy to damage the water pump. 1.When installing the pipeline should not bear on the pump, otherwise it is easy to damage the water pump.
2.When installing must tighten the ground foot bolt, and every interval certain period of time should inspect the unit to prevent it from loosing, so that no strong vibration occurs when pump starts operating and affects the performance of the pump.
3.Before you install the pump, you should carefully check whether there are any hard materials in the pump drainage channel that affect the pump's operation (such as stones, iron sands etc.) to prevent the excess flow parts from being damaged when the pump is operating.
4.For maintenance convenience and use safety, each should install a regulating valve on the pump's import and exit pipeline and each should install a pressure meter on the pump's import and exit flange, for high lift pump, to prevent water hammer, also should install a stop valve before the exit gate valve, to deal with sudden power failure and other loss of power accidents, thus ensuring that the pump is operating in a better working condition, extending the service life of the pump.
5. Pump ye luɔ̈ɔ̈i në kaam de luɔɔi, a dhil naŋ valve de piny, ku pip de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi
6.To not let impurities enter the pump. And blocking the drainage affects performance, you should install a filter at the front of the pump entrance. 6.To not let impurities enter the pump. And blocking the drainage affects the performance, you should install a filter at the front of the pump entrance.
7. ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ
8.The series pump flanges are all designed according to 2.5MPa specifications, so choose the pipeline flanges should be matched with it. 8.The series pump flanges are all designed according to 2.5MPa specifications, so choose the pipeline flanges should be matched with it.

Start, park, ku run
1. Luɔ̈ɔ̈i ka ŋot
1) ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr ye rotɛr
2) Lɔ̈k valve ye kɔɔr. Lɔ̈k valves. Ku bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i. Lɔ̈ɔ̈ŋ a liquor;
3) Lɔ motor. Lɛ̈k ba yɛl dɔ̈ɔ̈r looi, wala ba yɛl dɔ̈ɔ̈r looi, ba yɛl dɔ̈ɔ̈r looi, ba yɛl dɔ̈ɔ̈r looi. Gɛlɛr motɛr ye rot.
2. Lɔ̈k kɛnɛ luɔɔi
1) Lɔ̈ɔ̈ŋ valves import, tɔ̈ɔ̈u valves pipeline;
2) Lɔ̈k riɛl. Na cï pomp bɛ̈n lɔ̈ɔ̈m në tɛ̈n yenë yen lɔ̈ɔ̈m thïn, a bɛ̈n lɔ̈ɔ̈m në tɛ̈n yenë yen lɔ̈ɔ̈m thïn. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ:
3) Lëk tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n. Bearing tɛmɛ. A ka tɛmɛ ka tɛmɛ ka tɛmɛ 75°C, ka tɛmɛ ka tɛmɛ ka tɛmɛ 35°C.
4) Pii ye tɔ̈ɔ̈u në ɣön ye tɔ̈ɔ̈u thïn. 15 ml minit tök. A adhil ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ
5) Pump ye tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n A dhil tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
3. Parkir
1) ye valve dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈
2) ye valve ye cɔl burst valve ye cɔl burst valve ye cɔl burst valve ye cɔl burst valve ye cɔl burst valve ye cɔl burst valve ye cɔl burst valve ye cɔl burst valve;
3) Ne tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ hanga ba pomp de jii ya cɔk;
4) Cït mɛn ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n. Pump dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r

Lɔ̈k ku Lɔ̈k
1. Pii dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈
2. Pump ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
3. Pump ye cɔk tɔ̈u në kaam de luɔɔi ye kɔc cɔk tɔ̈u në kaam de luɔɔi ye kɔc cɔk tɔ̈u në kaam de luɔɔi. Motor ye baara kɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ;
4. Lɛ̈k bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ Lɔ̈k pomp bï luui në kaam de luɔɔi 20;
5. Pump adhil a tɔ̈ɔ̈u në tɛ̈n yenë yen luɔɔi thïn në kë bï kë cïï rot looi ya tɔ̈ɔ̈u;
6. Pump wïc bɛ̈n ya tɔ̈ɔ̈u në thaa 500 yic.
7. ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka
8.The unit in the operation occurred defect, can be excluded according to the following table provided method, if not excluded, don't dismantle the unit at random, please contact our factory repair department or special repair point at the same time. 8.The unit in the operation occurred defect, can be excluded according to the following table provided method, if not excluded when not excluded, don't dismantle the unit at random, please contact our factory repair department

Lɛɛr ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n

Failure
Sabab
Solution ye
1. Pump de pii cïï pii tɔ̈ɔ̈u, pressure meter ku vacuum meter ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u. a. Pii cïï bɛ̈n tääu në pomp
b. Pii cï lɔ̈ɔ̈m ku jii cï lɔ̈ɔ̈m
a. Pii dɔ̈ɔ̈r pump
b. Lɔ̈k bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i
2.Water pump does not absorb water, vacuum meter has shown high vacuum a. Valve ye tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u
b. Inhalation tube ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r
c. Pii ye tɔ̈ɔ̈u nhial
a. Kalibre wala waar valve
b. Lɔ̈ɔ̈ŋ wala waar pipi
c. Lɔ̈k dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r
3.Pressure meter tɔ̈u tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n a. Pii ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u
b. Dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r
c. Wheel block
d. Pump dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r
a. Lɔ̈ɔ̈m ka tɔ̈ɔ̈u piyi
b. Gɛɛr motor ye rot.
c. Lɔ̈ɔ̈ŋ ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl.
d. Pump ye rot juak.
4. Pump flow diminished wala lifting diminished. a. Wheel wala pipeline ye cɔk
b. Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl
c. Dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r
a. Lɔ̈ɔ̈ŋ kɛ̈ɛ̈k kɛ̈ɛ̈k kɛ̈ɛ̈k kɛ̈ɛ̈k kɛ̈ɛ̈k
b. Ye kä cï tɛ̈ɛ̈r waar.
c. Ajuiɛɛr ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ.
5. Pump ye dɔ̈ɔ̈r apɛi. a. Filling cover is too tight, filling letter is hot. Filling cover is too tight, filling letter is hot. Filling cover is too tight, filling letter is hot.
b. Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl
c. Lɔ̈ɔ̈m dɔ̈ŋ
a. Lɔ̈k ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc.
b. Ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
c. Lɔ̈k valve
6. Pump ye yic ye yic, pump ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic ye yic a. Pii ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi
b. Pii ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi ye cɔl pipi
c. Kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye
a. Dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr dɔɔr
b. Gɛɛr dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r dɛ̈ɛ̈r
c. Ajuiɛɛr de valve de luɔɔi bï pomp ya luui në kaam de luɔɔi cï kek gam
7. Pump ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n. a. Pump ye rot looi, ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot
b. Pump shaft and motor are not on the same central line. Pump shaft and motor are not on the same central line. Pump shaft and motor are not on the same central line. Pump shaft and motor are not on the same central line.
c. Ground foot bolt loose
a. Gɛɛ̈ɛ̈r kɔrɔ̈ɔ̈ŋ, kɔrɔ̈ɔ̈ŋ kɔrɔ̈ɔ̈ŋ kɔrɔ̈ɔ̈ŋ kɔrɔ̈ɔ̈ŋ kɔrɔ̈ɔ̈ŋ
b. Coaxiality of school water pump and motor
c. Bolt ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye
8. Bearing ye tɔ̈ɔ̈u. a. Lubricant oil dɔ̈ŋ wala dɔ̈ŋ, wala dɔ̈ŋ
b. Pump ye tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
a. Lɔ̈k kä ye kek looi, ku lɔ̈k kä ye kek looi ku lɔ̈k kä ye kek looi
b. Lɔ̈ɔ̈m kɛɛl


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!