◎ Product introduction: In dry transformer production process, steel core pre-heating, coil pre-drying, coil dip paint drying, epoxy resin curing and
Detalji proizvoda
变压器固化炉07
◎ Kuen:
Në luɔɔi de transformer ye cɔl dry, ye luɔɔi ye cɔl iron core pre-heating, coil pre-drying, coil dip paint drying, epoxy resin curing, ku jɔl ya luɔɔi ye cɔl process process ye thiekic apɛi, ye luɔɔi ye cɔl transformer quality, ku ye luɔɔi ye cɔl temperature uniformity of the curing furnace, and the reliability of the control system.
Transformer ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈
An company in transformer manufacturing industry has many customers, accumulated abundant experience, we can according to different products, different processes to provide customers with various heating methods, wind delivery methods, workpiece delivery methods, control methods and so on for reference, for you to choose the most suitable solution, so as to make the product's drying, hardening effect reach the best.
◎ Kä ye looi:
1.Adopting intelligent digital program temperature control instrument temperature control, PID parameter self-adjusting, solid state relay function adjustment, no contact continuous adjustment, automatic finishing all drying process, can meet any curing curve requirements, operation simple, performance reliable. A sɔrɔ ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
2. a tɔ̈u thɛɛr alarm system, a tɔ̈u thɛɛr alarm, a tɔ̈u thɛɛr alarm, a tɔ̈u thɛɛr alarm, a tɔ̈u thɛɛr alarm;
3.According to the different layout of the dried products, choose a reasonable hot air cycle method (bottom heating horizontal air delivery, side heating vertical air delivery, etc.), to make the studio's temperature more uniform, the coil drying, the curing effect is better.
4. A tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen
5. ye tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
6.The box has a explosion-proof door, if a accident occurs can reduce the loss to a low limit. 6.The box has a explosion-proof door, if a accident occurs can reduce the loss to a low limit.
7. tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
8. ye luui në luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi
9.Thermal insulation material use low thermal conductivity high quality insulation cotton, energy saving effect is obvious.
◎ A lëu bï ya luui në kë wïc raan ye luui: 
1. Kabinet de kontrol alëu bï ya looi në kë wïc raan luɔɔi bï ya looi në kë wïc raan luɔɔi bï ya looi në kë wïc raan luɔɔi bï ya looi në kë wïc raan luɔɔi bï ya looi në kë
2. Temperature recorder record all process temperature curve, you can choose paper or paperless recorder. 2. Temperature recorder record all process temperature curve, you can choose paper or paperless recorder. 2. Temperature recorder record all process temperature curve, you can choose paper or paperless recorder.
2. Sistɛm ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ
3.Computer centralized control system, a computer can remotely control multiple drying boxes temperature control program setting, temperature curve recording and other functions, easy to operate, control reliable.
4. ye tɛ̈n tɔ̈u piny, a lëu bï ya tɔ̈u piny, ka tɔ̈u piny, ka tɔ̈u piny, ka tɔ̈u piny, ka tɔ̈u piny, ka tɔ̈u piny, ka tɔ̈u piny, ka tɔ̈u piny
5. PLC control ye cɔl touch screen ye cɔl electric control
◎ Specifications Technical Parameters:
DGC-1
DGC-2
DGC-3
DGC-4
DGC-5
Studio size (width × depth × height) mm
2000×2000×2000
2000×2500×2000
2000×3000×2000
2000×4000×2000
2200×4000×2200
Tɛmpɛr luɔi (℃)
Ɣön tɛmɛ ~ 200
Ɣön tɛmɛ ~ 200
Ɣön tɛmɛ ~ 200
Ɣön tɛmɛ ~ 200
Ɣön tɛmɛ ~ 200
Voltage (V)
3-380
3-380
3-380
3-380
3-380
Power Frequency (Hz)
50
50
50
50
50
Puɔ̈ɔ̈l ye kɔɔr (kW)
54
60
66
78
84
Temperature uniformity (%)
±2.5
±2.5
±2.5
±2.5
±2.5
Temperature fluctuation (℃)
±1
±1
±1
±1
±1
Truck load
2T
3T
4T
5T
6T


Note: A lëu bï ya looi ku ya looi në kë wɛ̈t wɛ̈t wɛ̈t wɛ̈t wɛ̈t wɛ̈t wɛ̈t wɛ̈t. [Kɔmpaniɛ dɔ̈ɔ̈ŋ ye kɔc cïï gam]
Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!