
▍ Bayan koor↴
Power system consists of generating electricity, transformer, transmission, distribution of electricity several links, where the transformer is a very important component, its safe operation plays a very important role in the power system. Power system consists of generating electricity, transformer, transmission, distribution of electricity several links, where the transformer is a very important component, its safe operation plays a very important role in the power system. Power system consists of generating electricity, transformer, transmission, distribution of electricity Transformer tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen Ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ Kɔnɔ, tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ ye tɛmɛ
YL-BFK SmartTransformer Air Cooling Control CabinetA ye miniature control cabinet ye looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi Transformer air cooling control cabinet can achieve remote automatic and on-site manual control method, and can put various information upload display and downline control settings, to achieve superior intelligent control over the transformer whole cooling system, transformer air cooling control cabinet to achieve the purpose of saving energy and extending transformer service life, saving human and repair maintenance costs. Transformer air cooling control cabinet can achieve remote automatic and on-site manual control method, and can put various information upload display and downline control settings, to achieve superior intelligent control over the transformer whole cooling system, transformer air
▍ Luɔi lööŋ↴
●GB1094-2013 Power Transformer
●GB2900-1995 Wɛ̈ɛ̈r ë Electrical
●GB2536-2011 Transformer Oil
●GB/T13499-2002 Power Transformer Application Guide
●GB/T17468-2008 Power Transformer ye kuanycök
●JB/T3837-2010 Transformer Product Model Preparation Method
●DL/T572-2010 Power Transformer luɔɔi
●DL/T5147-2001 Lööŋ kɔnɔ̈ŋ kɔnɔ̈ŋ kɔnɔ̈ŋ kɔnɔ̈ŋ kɔnɔ̈ŋ kɔnɔ̈ŋ kɔnɔ̈ŋ
●GB/T2682-1981 Kä ye nyuɔɔth ku kä ye kek tɔ̈ɔ̈u në kä ye kek tɔ̈ɔ̈u në low voltage
●GB7251-2013 Low voltage complete switching equipment and control equipment
●DL/T720-2013 Power System Relay Protection Cabinet, Screen General Technical Conditions
●DL/T5136-2012 Luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi
●GB50054-2011 Low Voltage Distribution Design Specifications
▍ Parameters teknis↴
▍ Parameters teknis↴
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeLuɔi: 110kV, 220kV, 330kV, 500kV, 750kVTransformers ye tɔ̈ɔ̈u në tulu
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeInstallation method: outdoor floor type, wall mount type
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeKɔɔr: 3-phase 4-wire AC 2-way power input AC380V ± 15%
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeKɔɔr: DC input DC220V ± 10%
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeDɔŋ: 3000 m
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeTɛmɛɛr: -40 ℃ ~ + 85 ℃
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeHumidity: ≤95%RH
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeWind speed: ≤35m/s
✔ A ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a ye kɔc cɔl a yeKuen gël: IP55
▍ Model bayanna↴
▍ Model bayanna↴
▍ Funksiɔn prinsip↴
▍ Funksiɔn prinsip↴
YL-BFKWSmartTransformer Air Cooling Control CabinetSIMENS's programmable controller as the main control core, touch screen as the human-machine interface, AC contactor as the power execution component, circuit breaker, phase missing phase relay as the protective component, through touch screen setting operation parameters, according to the top layer oil temperature and operating load signal entering and exiting the corresponding mode of the cooler, the operation failure information through the communication port or failure contact, while storing information in the touch screen, also can automatically rotate the working power and cooler operating mode at any time.Smart Transformer Air Cooling ControlKabinet ye automation de control, status information, display and operation de raan ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam ye gam
"Power backup
Kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ Na cï kɛ̈ɛ̈r looi, a bɛ̈n ya tɔ̈ɔ̈u, na cï kɛ̈ɛ̈r looi ya tɔ̈ɔ̈u.
"Cooler ye tɔ̈ɔ̈u në tɛmɛ̈ɛ̈r ku tɛmɛ̈ɛ̈r
Ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ Ni "luɔi" wala "kony" ye tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n Na yɔ̈ɔ̈k ye kë cïï rot looi, cooler ye tɔ̈ në "backup" state ee rot looi, ku signal ye kë cïï rot looi ee rot looi, ku ye kë cïï rot looi ya tɔ̈ɔ̈u.
"Cooler bɛ̈n tɔ̈ɔ̈u në ye thaa
When the transformer operates, I, II section power disappears and all coolers exit operation, sending a "cooler complete stop failure" remote signal, while starting 20 minutes and 60 minutes delay time tripping, when the main variable upper layer oil temperature is higher than 70 degrees (user adjusted), 20 minutes after tripping exit. When the transformer operates, I, II section power disappears and all coolers exit operation, sending a "cooler complete stop failure" remote signal, while starting 20 minutes and 60 minutes delay time tripping, when the main variable upper layer oil temperature Na tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen
"Cooler mode ye rot
Motor run at 60 ℃ ~ 70 ℃ ambient temperature very easy cause "work" group fan motor bearing oil early deterioration, causing this group fan motor often burning, for this purpose designed the cooler operating mode timing rotation function, according to the touch screen set time, timing automatic rotation cooler operating mode, so that each group cooler alternately running at "work" mode.
"Power Supply Time Rotation
I, II segment power supply alëu bï ya tɔ̈ɔ̈u në kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam.
"Cooler start
Coolers juëc ye tɔ̈ɔ̈u në "luɔɔi", "kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc Transformer ye luui, cooler ye "luɔi" ye luui, ni cooler ye "luɔi" ye luui, cooler ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui, ye luui. Na yɔ̈ɔ̈r de ko cïï rot looi, "backup" cooler acï bɛ̈n ya tɔ̈ɔ̈u, ku ko cïï rot looi acï bɛ̈n ya tɔ̈ɔ̈u, ku ko cïï rot looi acï bɛ
"Alarms of Failure (Alarms of Failure)
Cool control cabinet bɛ warning signal to detect failure: I section power failure, II section power failure, cooler failure, cooler failure complete stop, control power disappearance or PLC failure etc. Cool control cabinet bɛ warning signal to detect failure: I section power failure, II section power failure, cooler failure, cooler failure complete stop, control power disappearance or PLC failure etc. Alarms form: passive contacts and serial communications are two forms. Alarms form: passive contacts and serial communications are two forms. Alarms form: passive contacts and serial communications are two forms. Alarms form: passive contacts and serial communications are two forms.
"Logging of Failures and Information Queries (Lɛ̈k ë kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
Touch screen ye baara kɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛ Klik kä ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n
"Automatic control of temperature and humidity inside the box
A tɔ̈ɔ̈u ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
"(Optional) Kabinet Air Conditioning Function
Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ Integrated structure design, professional dehumidification function, effective reducing the relative humidity within the control cabinet, high reliability, continuous operation over 10 years. A cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl a cɔl
"(Optional) Remote Control Center Multiple Monitoring
Kɔc juëc ye luui në Siemens S7-200smart PLC series network connection function, ku kɔc ye luui në remote monitoring.
"(Optional) ne frequency converter speed adjustment function
Ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen.
▍ Dimensions↴
Ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen, ka tɛmɛ yen.
DɛɛrW |
DɛɛrD |
YɛlɛH |
600-800mm |
500-700mm |
1500-1700mm |
▍ Garanti Kualitas↴
▍Client InstallationTrue Shooting↴
▍Lëk ordering↴
● Lɔ̈k tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
● Lɛ̈k cooler group
● Lɔ̈k pump, cooling fan, ku riɛl
● Na yïn wïc ba tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë yïn tɛ̈n yenë
● Ba tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
● Ajuiɛɛr kɔ̈k peei lëu bï ya looi në kë wïc kɔc
▍Post-sale service promise (Luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi ë luɔi)↴
● Akutnhom ee rot looi bï käke kɔc cï luöi ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn ya tɔ̈ɔ̈u thïn.
● Kompanyi ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye.
● Kɔc cï gam aye kɔc cï gam në luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi de käke luɔɔi.
● Kä ye looi tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
● Company service response time is within 2 hours, Shaanxi province within 1 working day to reach the site, and foreign users within 2 working days to reach the site. ● Company service response time is within 2 hours, Shaanxi province within 1 working day to reach the site, and foreign users within 2 working days to reach the site.
● Akutnhom bï kɔc ya kony në luɔɔi de käke kɔc ku käke kɔc ku käke kɔc ya kony në luɔɔi de käke kɔc ya kony në luɔɔi de käke kɔc ya kony në luɔɔi de käke kɔc ya kony në luɔɔi de käke kɔc ya kony në luɔɔi de käke kɔc ya kony në luɔɔi de käke kɔc ya kony në luɔɔi de käke kɔc.
● Kɔmpani bɛ kɔc ye luɔɔi ya gäm wɛ̈t ye kɔc ye luɔɔi ya gäm, ka kɔc ye luɔɔi ya gäm, ka kɔc ye luɔɔi ya gäm, ka kɔc ye luɔɔi ya gäm, ka kɔc ye luɔɔi ya gäm.
ITU Electrical Manufacturers Professional Production Smart TypeTransformer Air Cooling Control CabinetTransformer cooling control cabinet, product selection abundant, manufacturer price, professional electrotesting for 10 years, find transformer air cooling intelligent control cabinet, transformer cooling control cabinet, optional electric, build power boutiques.