Shanghai Gaotian Pump Co., Ltd.
Kuæa>Proizvodi>YW Pump ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
  • Адрес
    Shanghai Jinshan District Tinglin Town Industrial South District Linsheng Road No.178
Kontakt sada
YW Pump ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r
Product Name: Sub-Liquid Drainage Pump Model: 80YW40-15-4 Product Category: Clean Water Pump Series → Sub-Liquid Drainage Pump Diameter Range: DN25-50
Detalji proizvoda

Pump ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r

YW液下排污泵双管液下1米


Pump ye looi piny koom (single tube)
YW液下排污泵单管配置

Detail diagram:
YW液下排污泵底部细节

Head Motor End:
YW液下排污泵电机端

N'a tɔŋ wɛ̈t ye yɔɔdɔ, yɔɔdɔ: 021-57239999 walaClick to consult a specialist to select a quote (Lɔ̈k ba raan kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc)

Kä ye kek looi në pump de dɔ̈ɔ̈r de dɔ̈ɔ̈r de dɔ̈ɔ̈r de dɔ̈ɔ̈r de dɔ̈ɔ̈r:

Brand: Shanghai Takeda
Model No.: 150YW200-10-15
Material: Cast iron
Driving Mode: Elektrik
Prinsip: pomp centrifugal
Pump axis position: Side vertical
Wheel inhalation method: single inhalation
Wël: 1
Struktur wheel: closed single channel
Luɔi: Petroleum, Chemical, Pharmaceutical, Papermaking, Metallurgy, Wastewater Treatment
YW Pump
Lɔ̈ɔ̈i: 200 (m3/h)
Lift: 10 (m)

Kɔl ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l

Failure phenomena

Analiz dalil

Metode de exclusion

Pii dɔ̈ɔ̈r wala dɔ̈ɔ̈r

1, Rotational Error of Wheel

2Valve de luɔɔi acï tɛ̈ɛ̈r ku ka cïï tɛ̈ɛ̈r

3Pipeline wheel block

4A tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ

5、 Yüksek

6、Pumping medium density

7Medium viscosity

8、Seal ring mouth ring wear

1、Adjust wheel rotation direction

2、检查、修复、排除

3、Yɛlɛ̈ɛ̈k

4、检查电子设备和电路

5Pump ye waar wala lift ye dɔ̈k

6、 Pii ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ ye kɔrɔ

7、 Viscosity diminish

8、 Gɛɛr

Luɔi ka tɛŋ

1, wheel balance

2、Bearing damage

1、Shipping factory switching or correction

2、 Gɛɛr

Pump ka lëu bɛ̈n

1、 No phase

2, Wheel caam

3, winding, konnektɛr wala kabel ye cɔk

4、Stator winding burn

5、Electric control failed

1Lɔ̈ɔ̈ŋ linya bɛ̈n lajɛ

2、 Gäm kä ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k ye kɔ̈k

3、Lɔ̈k tɛ̈n Ohm Table tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n

4、Repair、Replacement winding

5Lɔ̈k ka waar

Current dɔŋ

1Voltage ye tɔ̈u

2Pipeline, wheel blocked (Pipeline, wheel blocked) (Pipeline, wheel blocked) (Pipeline, wheel blocked) (Pipeline, wheel blocked) (Pipeline, wheel blocked) (Pipeline, wheel blocked)

3.Lɔ̈ɔ̈i dɔ̈ŋ wala viscosity dɔ̈ŋ

4.Lift ka tɔ̈u

1、Ajuiɛɛr Voltage

2、Pipe cleaning、Wheel blockage

3、Gɛɛr density ku viscosity

4、Traffic dɔɔni, lift dɔɔni

Resistance insulation ye tɔt

1、Cable cable power cable end leakage

2Kabel dɔ̈ɔ̈r

3、Mechanical sealing wear generates leakage

4KɛlOSeal ring ye cɛl

5、Machine shell ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi ye kɔrɔsi

1、Tighten and tighten nuts 、Tighten and tighten nuts 、Tighten and tighten nuts 、Tighten and tighten nuts 、Tighten and tighten nuts 、Tighten and tighten nuts 、Tighten and tighten nuts

2、 Gɛɛr

3、 Gɛɛr

4、 Gɛɛr

5、 Repair

N'a tɔŋ wɛ̈t ye yɔɔdɔ, yɔɔdɔ: 021-57239999 walaClick to consult a specialist to select a quote (Lɔ̈k ba raan kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc kɔc)


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!